1G470 SR-74 Morrill Canyon Bridge Replacement Project

6 Documents in Project

Summary

SCH Number
2021010067
Lead Agency
California Department of Transportation, District 8 (DOT)
Document Title
1G470 SR-74 Morrill Canyon Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/14/2022
Document Description
The San Diego Regional Water Quality Control Board issued a Clean Water Act section 401 water quality certification (Certification No. R9-2022-0105) to the Project Applicant to upgrade an existing deteriorated bridge structure to modern structural standards on State Road 74 in the Cleveland National Forest, Riverside County, CA. This will involve placing a slab over the existing historic bridge structure, adding a storm drain outlet system with rock slope protection within Morrill Canyon Creek. One tree may also be removed. Temporary impacts will include the construction of a two-lane bridge to the south of the project area to divert traffic during construction. Permanent impacts to 0.003 acres of stream habitat will be mitigated for at a 2:1 area ratio at Riverpark Mitigation Bank.

Contact Information

Name
George Geatz
Agency Name
San Diego Regional Water Quality Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Riverside
Regions
Countywide
Parcel #
385-240-012, 385-240-014, 385-240-004, 385-240-002
State Highways
SR-74
Waterways
Morrill Canyon Creek
Township
29
Range
6S
Section
4W
Other Location Info
RIV-74 Post mile 3.1

Notice of Determination

Approving Agency
San Diego Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print