Upper Mormon Slough Erosion Repair

4 Documents in Project

Summary

SCH Number
2020120459
Lead Agency
San Joaquin County
Document Title
Upper Mormon Slough Erosion Repair
Document Type
NOD - Notice of Determination
Received
Posted
6/28/2021
Document Description
The Project is limited to channel grading and slope protection along the banks of the Upper Mormon Slough corridor. The activities consist of grubbing, clearing, and grading the banks in order to place rock slope protection (RSP) along approximately 0.63 mile of the north bank and approximately 0.23 mile of the south bank. The layer of the RSP being placed in the channel banks would be a minimum of 18 inches. Following the RSP placement, an 8-inch layer of thick gravel filter will be placed by hand on the channel banks to prevent erosion.

Contact Information

Name
Ian Ralston
Agency Name
Department of Fish and Wildlife
Contact Types
Responsible Agency

Location

Counties
San Joaquin
Regions
Northern California
Township
02N
Range
09E
Base
MDM
Other Location Info
The Project is located on the north and south banks of Mormon Slough.

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
the office location listed above for the Lead Agency. CDFW’s record of execution of the Streambed Alteration Agreement as Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print