Upper Drum-Spaulding Hyrdoelectric and Lower Drum Hydroelectric Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2020120416
- Lead Agency
- State Water Resources Control Board
- Document Title
- Upper Drum-Spaulding Hyrdoelectric and Lower Drum Hydroelectric Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/8/2021
- Document Description
- The Projects involve the transfer of water from the South Yuba River and North Fork of the North Fork American River to the Bear River basin, and the transfer of water from Bear River to the Sacramento River basin for the purpose of hydropower generation. The Projects are comprised of 29 reservoirs; six major water conduits; 11 powerhouses; five transmission lines; one distribution line; and associated structures, including recreation facilities.
- Contact Information
-
Kristen Gangl
Senior Environmental Scientist with California State Water Resources Control BOard
Lead/Public Agency
1001 I Street
Sacramento, CA 95814
Phone : (916) 323-9389
kristen.gangl@waterboards.ca.gov
Location
- Coordinates
- 38°8'24"N 121°15'0"W
- Cities
- Auburn Nevada City
- Counties
- Nevada Placer
- Regions
- Unincorporated
Notice of Determination
- Approving Agency
- California State Water Resources Control Board
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- https://www.waterboards.ca.gov/waterrights/water_issues/programs/water_quality_cert/drum_spaulding_ferc2310.html
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- 2021 Environmental Filing Fee Cash Receipt_DFG 753 PDF 329 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.