Phillips 66 Rodeo Renewed Project
9 Documents in Project
Summary
SCH Number
2020120330
Lead Agency
Contra Costa County
Document Title
Phillips 66 Rodeo Renewed Project
Document Type
NOD - Notice of Determination
Received
Posted
1/18/2024
Document Description
The project will modify the existing Rodeo refinery into a repurposed facility that would discontinue the refining of petroleum crude oil and switch to processing renewable feedstocks into renewable diesel fuel, renewable blending components, and renewable fuel gas. In addition to renewable fuels currently produced at the refinery, the project would enable the Rodeo refinery to produce up to 55,000 bpd of renewable transportation fuels from renewable feedstocks. Once the project is operational, the Rodeo refinery would supply up to 107,000 bpd of both renewable and blended transportation fuels, including a total of 67,000 bpd of renewable fuels. The facility could also receive, blend, and ship up to 40,000 bpd of gasoline and gasoline blendstocks. Other aspects of the project include the demolition of the Rodeo Carbon Plant and the Santa Maria refinery in Arroyo Grande, CA. Additionally, Phillips 66 pipelines 100, 200, 300, and 400, located in San Luis Obispo, Santa Barbara, Kern, Kings, Fresno, Merced, Stanislaus, San Joaquin, Alameda, and Contra Costa Counties will be decommissioned in-place, since they will no longer be necessary under the project to transport crude-based feedstocks from the Santa Maria facility to the Rodeo refinery.
Contact Information
Name
Joseph W. Lawlor Jr
Agency Name
Contra Costa County, Department of Conservation and Development
Job Title
Senior Planner
Contact Types
Lead/Public Agency
Address
Phone
Location
Coordinates
Counties
Contra Costa
Regions
Unincorporated
Cross Streets
San Pablo Avenue and Refinery Road
Zip
94572
Total Acres
495
Parcel #
357-010-001 (Primary)
State Highways
Interstate 80
Notice of Determination
Approving Agency
Contra Costa County
Approving Agency Role
Lead Agency
Approved On
County Clerk
Contra Costa
Final Environmental Document Available at
https://www.contracosta.ca.gov/RodeoRenewed
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.