Notice of Determination - Mirada Road Pedestrian Bridge Replacement and Bank Stabilization Project

3 Documents in Project

Summary

SCH Number
2020120284
Lead Agency
San Mateo County
Document Title
Notice of Determination - Mirada Road Pedestrian Bridge Replacement and Bank Stabilization Project
Document Type
NOD - Notice of Determination
Received
Posted
2/12/2021
Document Description
The County proposes to remove the existing concrete arch bridge and metal pedestrian bridge and install a new aluminum pedestrian bridge crossing the Arroyo de en Medio. To protect the bridge, trail, roadway, utilities, and properties, the project would install shotcrete walls with tieback anchors as well as rock slope protection along the bluff face and sections of the north and south banks of the Arroyo de en Medio. The project also includes relocation of existing utilities supported by the existing bridge.

Contact Information

Name
Krzysztof Lisaj
Agency Name
County of San Mateo Department of Public Works
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Half Moon Bay, Miramar
Counties
San Mateo
Regions
Unincorporated
Cross Streets
Medio Avenue & Mirada Road
Zip
94019
Total Acres
1.6
Parcel #
N/A
State Highways
1
Railways
N/A
Airports
Half Moon Bay/Eddie Andreini Sr.
Schools
Wilkinson; El Granada Elementary; Picasso Preschool; HMB High
Waterways
Arroyo de en Medio

Notice of Determination

Approving Agency
County of San Mateo
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Mateo
Final Environmental Document Available at
https://publicworks.smcgov.org/projects/california-environmental-quality-act-ceqa-postings

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print