Whitewater Preserve Levee Replacement Project

2 Documents in Project

Summary

SCH Number
2020120111
Lead Agency
California Coachella Valley Mountains Conservancy (CVMC)
Document Title
Whitewater Preserve Levee Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
1/22/2021
Present Land Use
The Wildlands Conservancy’s Whitewater Preserve is located along the banks of the Whitewater River north of the I-10 Freeway crossing in the County of Riverside. The existing facilities, campgrounds, and sensitive habitat are currently protected from damaging flows in the river by an older earthen levee system. The levee was originally constructed by the Whitewater Trout Company which previously owned the property. This existing system is currently experiencing erosion and bank failures and it is anticipated that the existing system would not provide adequate flood protection during a 100-year (one-percent annual chance) storm event.
Document Description
The Project is for a replacement levee at the Whitewater Preserve for the purposes of continued flood protection for up to 100-year flood events. The parcel is designated Open Space and zoned Controlled Development Areas.

Contact Information

Name
Jim R. Karpiak
Agency Name
Coachella Valley Mountains Conservancy
Contact Types
Lead/Public Agency

Name
Agency Name
Coachella Valley Mountains Conservancy
Contact Types
Project Applicant

Location

Counties
Riverside
Regions
Countywide
Cross Streets
Whitewater Canyon Road and Tipton Road
Zip
92282
Total Acres
8
Parcel #
514-240-001, -04, -06, -14, and -16
State Highways
Interstate 10
Waterways
Whitewater River
Township
2S
Range
3E
Section
22
Base
SB

Notice of Determination

Approving Agency
Coachella Valley Mountains Conservancy
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print