Ishi Conservation Camp Kitchen Replacement Project

3 Documents in Project

Summary

SCH Number
2020120093
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Ishi Conservation Camp Kitchen Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
1/7/2021
Document Description
The Ishi CC Kitchen Replacement Project consists of the replacement of a kitchen and dining room that was destroyed by a fire on July 19, 2017. The project includes the following: 1) A new 55’ by 87’ single story kitchen (4,785 sf) and dining building, 2) A new 18’ by 6’ trash enclosure and 9’4” by 17’4” pumphouse/wash area (163 sf), 3) Approximately 7,400 sf of concrete pavement to replace existing asphalt and installation of 2,000 sf of sidewalk, 4) Installation of outdoor mechanical equipment, outdoor electrical transformer, switchgear and emergency generator, 5) Connection of site utilities to new building (sewer, water, gas, power, and telecommunications), 6) Installation of a 180,000-gallon fire water storage tank (approximately 40’ in diameter and 32’ high), 7) Trenching of approximately four and a half feet deep by six feet wide for approximately 1,025 feet from the kitchen side to the water tank for water pipeline and electrical/communication conduit installation, 8) Onsite construction staging area of approximately 120’ by 120’ on previously disturbed ground, 9) Dismantling and reassembling of an existing rock wall, 10) Replacement of a current 1,000-gallon grease interceptor with a 1,500-gallon interceptor.

Contact Information

Name
Christina Snow
Agency Name
Department of Forestry and Fire Protection
Contact Types
Lead/Public Agency

Location

Counties
Tehama
Regions
Northern California
Cross Streets
Fletcher Trail

Notice of Determination

Approving Agency
Department of Forestry and Fire Protection
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.