Firebaugh Flood Risk Reduction Feasibility Study

2 Documents in Project

Summary

SCH Number
2020110268
Lead Agency
City of Firebaugh
Document Title
Firebaugh Flood Risk Reduction Feasibility Study
Document Type
NOD - Notice of Determination
Received
Posted
2/22/2021
Document Description
The Firebaugh Flood Risk Reduction Project will occur in three areas. ln Area 1, about 1.1 miles of new levee will be built. ln Area 2, a severely eroded riverbank will be reinforced to protect adjacent City infrastructure from flooding by the San Joaquin River. ln Area 3, a new levee will be built around the existing water treatment plant infrastructure to protect it against flooding. ln addition, the existing levee might be enhanced at other areas such as the Firebaugh rodeo grounds, although those plans are contingent on the results of a flood modeling study. Final design of the flood protection measures will be determined following this feasibility analysis.

Contact Information

Name
Rita Lozano
Agency Name
Deputy Clerk
Contact Types
Lead/Public Agency

Location

Cities
Firebaugh
Counties
Fresno
Cross Streets
1133 P Street
Zip
93622
State Highways
California
Township
Fireba
Other Location Info
riverbank of San Joaquin River

Notice of Determination

Approving Agency
City of Firebaugh
Approving Agency Role
Lead Agency
Approved On
County Clerk
Fresno
Final Environmental Document Available at
City of Firebaugh, 1133 P Street, Firebaugh, CA 93622

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print