Clover Creek Bridge (14C-0015) Replacement at First Street Project

4 Documents in Project

Summary

SCH Number
2020110165
Lead Agency
Lake County
Document Title
Clover Creek Bridge (14C-0015) Replacement at First Street Project
Document Type
NOD - Notice of Determination
Received
Posted
9/28/2023
Document Description
The proposed replacement structure is a three 12-foot by 8-foot cell cast-in-place reinforced concrete box culvert. The continuous mat foundation of the box culvert is well suited for the weak liquefiable soils at the site. The culvert will be designed to pass the 50-year and 100-year design storms without freeboard. Road work includes reconstructing the approaches along First Street conforming at the intersection with Washington Street to the west, and approximately 200 feet past the bridge to the east. The approach road width will be constructed to current County standards, with 15 to 20 feet paved traveled way/shoulders in each direction and 5' sidewalks. Parking along First Street will be replaced as necessary. Driveways will be reconstructed to conform to the new roadway profile.

Contact Information

Name
Sara Gevorgyan
Agency Name
Central Valley Regional Water Quality Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Lake
Regions
Northern California
Other Location Info
Clover Creek Bridge (14C-0015), 400 block of First Street County lake

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Lake
Final Environmental Document Available at
https://ceqanet.opr.ca.gov/2020110165/2

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print