Streambed Alteration Agreement No. 1600-2017-0430-R1 for Timber Harvesting Plan (THP) 1-17-070-HUM
Summary
- SCH Number
- 2020110125
- Lead Agency
- California Department of Forestry and Fire Protection (CAL FIRE)
- Document Title
- Streambed Alteration Agreement No. 1600-2017-0430-R1 for Timber Harvesting Plan (THP) 1-17-070-HUM
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/6/2020
- Document Description
- The Department of Fish and Wildlife (CDFW) is issuing an agreement for a Class I bridge installation, Class I water drafting, Class I fill removal and a Class III temporary crossing.
- Contact Information
-
Nicholas Simpson
Department of Fish and Wildlife
Lead/Public Agency
601 Locust Street
Redding, CA 96001
Phone : (707) 445-6512
nicholas.simpson@wildlife.ca.gov -
Warren Murphy
Project Applicant
Location
- Counties
- Humboldt
- Regions
- Northern California
- Other Location Info
- The project is located approximately approximately 0.6 miles southeast of Holmes in Humboldt County on Larabee Creek and Chris Creek, tributaries to the mainstem Eel River. The project is located in Section 2, T1S, R02E; Humboldt Base and Meridian, in the Redcrest, U.S. Geological Survey 7.5-minute quadrangle.
Notice of Determination
- Approving Agency
- Department of Fish and Wildlife
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- The final EIR, Negative Declaration or THP/NTMP that was prepared by the Lead Agency for this project is available to the General Public at the office location listed above for the Lead Agency. CDFW’s CEQA Findings are available at the Eureka CDFW office located at 619 Second Street, Eureka, California, 95501.
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- Yes (Timber Harvesting Plan)
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Attachments
- Notice of Determination
- 1600-2017-0430-R1_1-17-070-HUM_Larabee_Ranch_Holdings_THP_NOD PDF 381 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.