Antelope Valley Line Capacity and Service Improvements Program

4 Documents in Project

Summary

SCH Number
2020109001
Lead Agency
Los Angeles County Metropolitan Transportation Authority (LSCMTA)
Document Title
Antelope Valley Line Capacity and Service Improvements Program
Document Type
NOD - Notice of Determination
Received
Posted
12/8/2021
Document Description
The Proposed Project involves the construction of three capital improvements which would provide the capacity required to allow Metrolink commuter rail service to increase along the Antelope Valley Line (AVL) to 30-minute bi-directional headways between Los Angeles Union Station and the Santa Clarita Valley and up to 60-minute bi-directional headways between the Santa Clarita Valley and the Lancaster Terminal by the year 2028. The three capital improvements include the following: the Balboa Double Track Extension would extend the existing double track approximately 6,300 feet north from Balboa Boulevard to Sierra Highway in the City of Los Angeles; the Canyon Siding Extension would add approximately 8,400 feet of new double track between Soledad Canyon Road to Golden Oak Road and also provide a second station platform at the existing Santa Clarita Metrolink station in the City of Santa Clarita; and the Lancaster Terminal Improvements would include expansion of the existing train layover facilities by adding one new 1,000-foot-long and two 500-foot-long train storage tracks in the vicinity of the existing Lancaster Terminal Metrolink Station in the City of Lancaster.

Contact Information

Name
Brian Balderrama
Agency Name
Los Angeles County Metropolitan Transportation Authority
Job Title
Senior Director, Program Management
Contact Types
Lead/Public Agency

Location

Cities
Lancaster, Los Angeles
Counties
Los Angeles
Regions
Countywide
Other Location Info
Los Angeles County from City of Los Angeles to City of Lancaster

Notice of Determination

Approving Agency
Los Angeles County Metropolitan Transportation Authority
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://www.metro.net/projects/avl/

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print