Great Oaks South Backup Generating Facility

4 Documents in Project

Summary

SCH Number
2020100431
Lead Agency
California Energy Commission
Document Title
Great Oaks South Backup Generating Facility
Document Type
EIR - Draft EIR
Received
Present Land Use
Industrial Park and Transit Employment Center
Document Description
The California Energy Commission (CEC) has the exclusive authority to certify all thermal power plants (50 megawatts [MW] and greater) and related facilities proposed for construction in California. The SPPE process allows applicants with facilities between 50 and 100 MW to obtain an exemption from CEC’s jurisdiction and proceed with local permitting rather than requiring CEC certification. CEC can grant an exemption if it finds that the proposed facility would not create a substantial adverse impact on the environment or energy resources. Public Resources Code section 25519(c) designates CEC as the lead agency, in accordance with the California Environmental Quality Act (CEQA), for all facilities seeking an SPPE. SV1, LLC, a wholly owned subsidiary of Equinix, LLC (SV1 or applicant) filed an application with the CEC seeking an exemption from the CEC’s jurisdiction (Small Power Plant Exemption, or SPPE) for the Great Oaks South Backup Generating Facility (GOSBGF) (20-SPPE-01). The GOSBGF would be part of the Great Oaks South Data Center (GOSDC) to be located in the City of San Jose. The project was approved by the city on February 1, 2017 but was not constructed. Since its approval, SV1, LLC has made project design changes and is now seeking approval of an SPPE for the GOSBGF. The GOSDC would consist of three 182,350 square foot, two-story data center buildings. The project site is approximately 18-acres in size. The GOSBGF would consist of 36 3.25-MW diesel-fired generators in six generation yards that would each be separately electrically interconnected to the three data center buildings. The GOSBGF would be used exclusively to provide backup generation and uninterruptible power supply for the GOSDC, and other than for routine maintenance and testing, would only operate in the event of a failure of the electrical service from Pacific Gas and Electric Company (PG&E) to the data center. In addition, the GOSBGF would include three life safety diesel fired generators, each capable of generating 0.50 MW. GOSBGF would have a generating capacity of up to 99.0 MW. The GOSDC would connect to a new PG&E substation via five new 21 kilovolt (kV) distribution feeders that would extend underground either along Via Del Oro or along Great Oaks Boulevard, or via both routes to the project site. The California Public Utilities Commission has granted PG&E approval to construct the new substation, which is called the “Santa Teresa Substation”.

Contact Information

Name
Lisa Worrall
Agency Name
California Energy Commission
Contact Types
Lead/Public Agency

Location

Cities
San Jose
Counties
Santa Clara
Regions
Citywide
Cross Streets
Via Del Oro and Great Oaks Boulevard
Zip
95119
Total Acres
18
Jobs
42
Parcel #
706-02-060, 706-02-057
State Highways
SR-82, SR-85, & US-101
Railways
Valley Transportation Authority
Airports
-
Schools
See Attachment A to NOC form
Waterways
Coyote Creek, Santa Teresa Spring

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 4 (DOT), California Department of Water Resources (DWR), California Energy Commission, California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), Department of Toxic Substances Control, Office of Historic Preservation, San Francisco Bay Conservation and Development Commission (BCDC), State Water Resources Control Board, Division of Water Quality
Development Types
Other (Data center with backup diesel generators)
Local Actions
Use Permit
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Noise, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wildfire, Soil erosion/compaction/grading

Attachments

Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print