Streambed Alteration Agreement No. 1600-2016-0203-R1 "Homeboy" Timber Harvesting Plan (THP) 2-15-088-SIS.

Summary

SCH Number
2020100426
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement No. 1600-2016-0203-R1 "Homeboy" Timber Harvesting Plan (THP) 2-15-088-SIS.
Document Type
NOD - Notice of Determination
Received
Posted
10/23/2020
Document Description
The project is limited to four encroachments including repair or replacement of an existing 18 inch corrugated metal pipe (CMP), water drafting from two existing off channel water drafting sites, and construction of a new off channel waterhole or installation of a new gravity fed portable water tank as described in the Timber Harvesting Plan (THP) and the 1611 Addendum on pages 29, 31, 38, 39, 41, 56.1-56.3, 62, 66, and 67 of the THP. Pages 48 and 51 of the THP show the locations of the four encroachments.

Contact Information

Name
Merissa Hanisko
Agency Name
Department of Fish and Wildlife Northern Region
Contact Types
Lead/Public Agency

Location

Counties
Siskiyou
Other Location Info
The project is located on an unnamed tributary to West Fork Cottonwood Creek, Bogart Gulch (tributary to West Fork Cottonwood Creek), and West Fork Cottonwood Creek (tributary to Cottonwood Creek), in the West Fork Cottonwood Creek Planning Watershed (Calwater v.2.2: 1105.360302), Siskiyou County, California; Township 47N, Range 07W, Sections 4, 6, and 8; Mount Diablo Base and Meridian; U.S. Geological Survey 7.5 minute quadrangle map Cottonwood Peak 1983.

Notice of Determination

Approving Agency
Department of Fish and Wildlife (CDFW)
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print