State Route 51 Bridge Deck Replacement Project

11 Documents in Project

Summary

SCH Number
2020100388
Lead Agency
California Department of Transportation, District 3 (DOT)
Document Title
State Route 51 Bridge Deck Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
5/17/2022
Document Description
The amendment includes increasing the footprint of the in-water bridge piers an additional 0.059 acres. The design of the in-water bridge piers changed since the execution of the Lake and Streambed Alteration Agreement by altering the shape of the piers to provide scour protection, thus increasing permanent impacts to the Lower American River. The amendment also includes, but is not limited to, changes to the avoidance and minimization measures to limit vegetation and ground disturbing activities to periods of dry weather and low rainfall, increase the number of elderberry shrubs being transplanted from 13 to 70, clarifying language on locally appropriate native plant propagules, and allowing siltation curtains to remain in place, overnight, during dredging operations.

Contact Information

Name
Ian Boyd
Agency Name
Department of Fish and Wildlife
Job Title
Senior Environmental Scientist (Specialist)
Contact Types
Responsible Agency

Location

Cities
Sacramento
Counties
Sacramento
Regions
Northern California
Other Location Info
The project is located along State Route (SR) 51 in Sacramento County on the Lower American River and within the floodplain of the Lower American River. The project extends between post miles (PM) 2.6 and 3.2, approximately 1 mile from the city of Sacramento.

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
the office location listed above for the Lead Agency. CDFW’s record of execution of the above Lake and Streambed Alteration Agreement Amendment 1 as Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print