Sacramento River Erosion Control and Habitat Enhancement Project

6 Documents in Project

Summary

SCH Number
2020100329
Lead Agency
Brannan-Andrus Levee Maintenance District (BALMD)
Document Title
Sacramento River Erosion Control and Habitat Enhancement Project
Document Type
NOD - Notice of Determination
Received
Posted
12/14/2020
Present Land Use
Agricultural Cropland and Urban zoning designations
Document Description
The Brannan-Andrus Levee Maintenance District (BALMD) is proposing to resolve erosion issues on the left bank of the Sacramento River, on Brannan Island, at approximate River Miles (RM) 14.60 to 15.18, 16.36 to 17.00 and 17.13 to 17.34. Once completed, the project would provide suitable levee erosion control on approximately 1.2 nautical miles (NM) of levee; provide fish-friendly habitat through the creation of wetland and riparian benches on the Sacramento River channel margin; and minimize long-term maintenance and repair costs by repairing existing areas of erosion using stable and effective erosion control methodologies.

Contact Information

Name
Gilbert Labrie, AIA
Agency Name
Brannan-Andrus Levee Maintenance District
Contact Types
Lead/Public Agency

Name
Agency Name
Brannan-Andrus Levee Maintenance District
Contact Types
Project Applicant

Location

Cities
Isleton
Counties
Sacramento
Regions
Unincorporated
Cross Streets
State Highways 160 and 12
State Highways
State Highways 160 and 12
Waterways
Sacramento River
Other Location Info
Sacramento County, left bank of Sacramento River, South of Isleton, CA

Notice of Determination

Approving Agency
Brannan-Andrus Levee Maintenance District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print