Live Oak Boat Ramp Sediment and Invasive Species Removal Project

2 Documents in Project

Summary

SCH Number
2020100322
Lead Agency
Sutter Butte Flood Control Agency (SBFCA)
Document Title
Live Oak Boat Ramp Sediment and Invasive Species Removal Project
Document Type
NOD - Notice of Determination
Received
Posted
2/24/2021
Document Description
The Project involves dredging to remove sediment that has accumulated in portions of the Feather River. The dredging operation would be staged from the existing Live Oak Recreational Park Boat Ramp facility and adjacent lands. Dredging would remove approximately ±1.5 acres of invasive water primrose and ±3,400 cubic yards (cy) of sediment from the Live Oak Recreational Park Boat Ramp facility. Dredged spoils would be dewatered at the boat ramp and spoils would be disposed at the Gridley WWTP emergency ponds or at the Ostrom Road or Neal Road landfills. The State Lands Commission action is an approval of a 5-year General Lease – Public Agency Use through February 24, 2026.

Contact Information

Name
Christopher Huitt
Agency Name
CA State Lands Commission
Contact Types
Responsible Agency

Location

Cities
Live Oak
Counties
Sutter
Regions
Countywide, Northern California
Waterways
Feather River
Other Location Info
Sutter County, town of Live Oak on the right bank of the Feather River.

Notice of Determination

Approving Agency
CA State Lands Commission
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sutter
Final Environmental Document Available at
At this time, the Commission’s offices are closed to the public due to public health and safety concerns regarding the Novel Coronavirus (COVID-19). Please contact Commission staff for the most up-to-date information on the availability of the MND and the record of project approval.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print