Ortega Park Master Plan

3 Documents in Project

Summary

SCH Number
2020100179
Lead Agency
City of Santa Barbara
Document Title
Ortega Park Master Plan
Document Type
NOD - Notice of Determination
Received
Posted
9/24/2021
Document Description
The project consists of the Ortega Park Master Plan, including demolition of existing facilities and construction of a new swimming pool, wading pool, water slide, skate park, splash pad, sports courts, shade sails, sports field with synthetic turf, ping pong tables, cornhole, and buildings for restrooms and maintenance. On-site improvements such as fencing, parking, landscaping, dumpsters and related enclosures, and internal walkways are also proposed. Public art would remain a part of the project, as documentation of all existing murals would occur prior to any on-site grading or demolition. Five (5) existing murals are proposed for relocation on-site, three (3) existing murals would be recreated, and four (4) of the existing murals would be re-envisioned. Additional blank space for new murals is also proposed. All new murals would be consistent with a Mural Implementation Plan to ensure thematic consistency. Right-of-way improvements including street parking, parking medians, and sidewalk installation are proposed. Front setback modifications to allow parking within the front setbacks along both Ortega Street and Salsipuedes Street are required. Planning Commission review of select amenities for consistency with the “Community Buildings” and “Sports Facilities” park designations is required. The park is considered a Community Park (except the ballfields and related facilities), a Sports Facility (for the ballfields and related facilities only), and a Community Building (the Welcome House and pool) per City Council Resolution 17-074. The parcel is zoned P-R, with a General Plan designation of Parks and Open Space.

Contact Information

Name
Stephanie Swanson
Agency Name
City of Santa Barbara
Contact Types
Lead/Public Agency

Location

Cities
Santa Barbara
Counties
Santa Barbara
Cross Streets
Ortega Street and Salsipuedes Street
Zip
93101
State Highways
U.S. 101
Township
4N

Notice of Determination

Approving Agency
City of Santa Barbara
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Barbara
Final Environmental Document Available at
https://www.santabarbaraca.gov/services/planning/erds/draft/ortega_park.asp

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print