PG&E Rio Dell Junction-Bridgeville Structure 038/007 (Project)
Summary
- SCH Number
- 2020100141
- Public Agency
- California Regional Water Quality Control Board, North Coast Region 1 (RWQCB)
- Document Title
- PG&E Rio Dell Junction-Bridgeville Structure 038/007 (Project)
- Document Type
- NOE - Notice of Exemption
- Received
- Posted
- 10/5/2020
- Document Description
- The purpose of the Project is to restore areas impacted by activities that PG&E contractors performed without authorization while accessing a wooden electrical pole, structure 038/007. The applicant will excavate unauthorized fill to two unnamed tributaries, revegetate riparian and upland areas that had been disturbed, and decommission a section of access road that had been constructed without authorization.
- Contact Information
-
Shannon Strong
North Coast Regional Water Quality Control Board
Lead/Public Agency
5550 Skylane Boulevard
Santa Rosa, CA 95403
Phone : (707) 576-2499
Location
- Cities
- Bridgeville
- Counties
- Humboldt
- Other Location Info
- 40.470517° N, 123.814256° Wand 40.470209° N, 123.814711 ° W
Notice of Exemption
- Exempt Status
- Categorical Exemption
- Type, Section or Code
- Section 15301 (b)(c)(d) Existing Facilities
- Reasons for Exemption
- The Project involves the repair of streambed at two watercourse crossings and the decommissioning of a portion of access road. The road and crossings are existing facilities that provided access to a structure that provides electric power.
Attachments
- Notice of Exemption
- 2020100141_PG&E-038-007 PDF 576 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.