CAL 26 Slope Stabilization
5 Documents in Project
Summary
SCH Number
2020100132
Lead Agency
California Department of Transportation, District 6
(DOT)
Document Title
CAL 26 Slope Stabilization
Document Type
NOD - Notice of Determination
Received
Posted
6/8/2022
Document Description
The Project includes the installation of slope stabilization material, the construction of soldier pile walls (retaining walls), the construction of three retaining walls, the installation of four culverts, and the placement of rock slope protection (RSP) on the slopes of the creek. The Project is limited to vegetation clearing and grubbing, tree removal, placement of fill on the banks, drilling of the banks, grading of the banks, and concrete pouring.
Contact Information
Name
Harvey Tran
Agency Name
Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Counties
Calaveras
Regions
Northern California
Other Location Info
The Project is located at an unnamed creek along State Route 26 near the North Fork Calaveras River, in the County of Calaveras, State of California. The post miles (PM) for this Project are CAL-26 PM 21.7 to 22.8.
Notice of Determination
Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Calaveras
Final Environmental Document Available at
the office location listed above for the Lead Agency. CDFW’s record of execution of the above Lake and Streambed Alteration Agreement as Responsible Agency is available at CDFW’s regional office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.