*PROJECT WITHDRAWN* World Oil Tank Installation Project

5 Documents in Project

Summary

SCH Number
2020100119
Lead Agency
Port of Long Beach
Document Title
*PROJECT WITHDRAWN* World Oil Tank Installation Project
Document Type
NOD - Notice of Determination
Received
Posted
10/29/2021
Document Description
*Project withdrawn per lead request, see memo attachment The World Oil Tank Installation Project (Project) involves the construction and operation of two new 25,000 barrel-capacity internal floating roof petroleum storage tanks within the existing World Oil Terminal located on Pier C in the Long Beach Harbor District. Construction of the two new tanks would include new tank foundations and pipeline connections to existing facility infrastructure, such as the truck loading racks. The Project would provide additional storage capacity to increase the efficiency of terminal operations and supplant the terminal's existing tanks that provide crude oil storage to the World Oil Refinery in South Gate. The existing tanks would then be removed from dedicated refinery service and become available to lease to third-party vendors.

Contact Information

Name
Jennifer Blanchard
Agency Name
Port of Long Beach
Contact Types
Lead/Public Agency

Location

Cities
Long Beach
Counties
Los Angeles
Regions
Southern California
Cross Streets
Pier C Street and Pico Avenue
Zip
90813
Total Acres
6
Parcel #
7436-008-002
Schools
Edison ES, Cesar Chavez ES
Waterways
Pacific Ocean, Long Beach Harbor Channel 2, Los Angeles River, Dominguez Channel
Township
S
Range
13
Section
5
Base
W

Notice of Determination

Approving Agency
Port of Long Beach
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
www.polb.com/ceqa

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print