Streambed Alteration Agreement No. 1600-2020-0009-R1 "Slingshot" Timber Harvesting Plan (THP) 2-19-00163-TRI.

Summary

SCH Number
2020100053
Lead Agency
Forestry and Fire Protection, Department of (California Department of Forestry and Fire Protection)
Document Title
Streambed Alteration Agreement No. 1600-2020-0009-R1 "Slingshot" Timber Harvesting Plan (THP) 2-19-00163-TRI.
Document Type
NOD - Notice of Determination
Received
Posted
10/2/2020

Document Description
The project is limited to four encroachments including the repair of one existing permanent culvert crossing, the replacement of one existing permanent culvert crossing, alteration of an existing Class II spring, and the installation of one new permanent culvert crossing as identified and described on pages 40 and 41 of the THP. The four crossing locations are shown on THP pages 81 and 82.

Contact Information
Merissa Hanisko
Department of Fish and Wildlife Northern Region
1625 South Main Street
Yreka, CA 96097

Phone : (530) 841-2568

Location

Counties
Trinity
Other Location Info
The project is located on Buck Gulch tributary to Trinity Reservoir and unnamed tributaries to Mule Creek, in the Mule Creek (1106.400908) Planning Watershed, in the County of Trinity, State of California; Township 35N, Range 09W sections 13 and 24; Mount Diablo base and meridian; U.S. Geological Survey 7.5 minute quadrangle maps Covington Mill and Trinity Dam.

Notice of Determination

Approving Agency
Department of Fish and Wildlife (CDFW)
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
The final EIR, Negative Declaration, or THP that was prepared by the Lead Agency for this project is available to the General Public at the office location listed above for the Lead Agency. CDFWs CEQA Findings are available at the CDFW office identified above.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2020100053_1600-2020-0009-R1_TRI_Slingshot THP_NOD_Signed   PDF 957 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print