Los Angeles Aerial Rapid Transit Project NOD

5 Documents in Project

Summary

SCH Number
2020100007
Lead Agency
Los Angeles County Metropolitan Transportation Authority (LSCMTA)
Document Title
Los Angeles Aerial Rapid Transit Project NOD
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2024
Document Description
The Los Angeles Aerial Rapid Transit Project would connect Los Angeles Union Station (LAUS) to the Dodger Stadium property via an aerial gondola system in downtown Los Angeles. The proposed 1.2-mile route would travel generally along Alameda Street, Spring Street, and Bishops Road from LAUS to Dodger Stadium, with an intermediate station at the southernmost entrance of the Los Angeles State Historic Park. The proposed aerial gondola system would include aerial cables, passenger stations, a non-passenger junction, towers to support the aerial cables between the stations/junction, and gondola cabins for the passengers. When complete, the proposed Project would have a maximum capacity of approximately 5,000 people per hour per direction, and the travel time from LAUS to Dodger Stadium would be approximately seven minutes. The Draft EIR was released on October 17, 2022 for a 60-day public comment period ending on December 16, 2022. On November 15, 2022, Metro extended the public comment period an additional 30 days for a 90-day public comment period ending on January 17, 2023. The Final EIR was released on December 4, 2023. The Final EIR was certified on February 22, 2024.

Contact Information

Name
Cory Zelmer
Agency Name
Los Angeles County Metropolitan Transportation Authority
Job Title
Project Manager
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles
Counties
Los Angeles
Regions
Citywide, Countywide
Cross Streets
Alameda St from Los Angeles St to Spring St, N Broadway and Bishops Rd, Stadium Way
Zip
90012
State Highways
SR-110
Schools
Cathedral High School
Waterways
Los Angeles River

Notice of Determination

Approving Agency
Los Angeles County Metropolitan Transportation Authority
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://www.metro.net/projects/aerial-rapid-transit/

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print