NOD Pump Station Project

6 Documents in Project

Summary

SCH Number
2020099009
Lead Agency
Reclamation District 1001
Document Title
NOD Pump Station Project
Document Type
NOD - Notice of Determination
Received
Posted
3/23/2021
Document Description
Reclamation District (RD) 1001 proposes to construct a new auxiliary drainage pump station located along the Natomas Cross Canal (NCC) North Levee at the south end of the RD 1001 Lateral 4 Channel, approximately one mile northeast of the existing RD 1001 Main Drainage Pump Plant within Sutter County, California. The Auxiliary Drainage Pump Station Project (Project) will utilize grant funds through the Federal Emergency Management Agency (FEMA) Hazard Mitigation Grant Program (HMGP) in coordination with the State of California Office of Emergency Services (CalOES). RD 1001 currently has two electrically powered pump stations which discharge drainage flows from the agricultural areas within RD 1001 into the NCC. During prior flood events, the risk of damages caused by flooding was increased due to the unreliability of the electrical power to these pump stations. Furthermore, the existing pump stations are not able to be upgraded with backup generators due to the age of the existing facilities. To minimize the flood risk due to loss of power at the existing pump stations, the proposed Project will involve the construction of a fuel-powered pump station that would remain operational during the loss of electrical power, maintaining some pumping capacity of drainage flows.

Contact Information

Name
Kimberly Reese
Agency Name
Reclamation District 1001
Contact Types
Lead/Public Agency

Location

Counties
Sutter
Cross Streets
Natomas Cross Canal and Lateral 4 Canal Sutter County

Notice of Determination

Approving Agency
Reclamation District 1001
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sutter
Final Environmental Document Available at
Reclamation District 1001, 1959 Cornelius Ave., Rio Oso, CA 95674

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print