Sycamore Avenue Trunk Sewer Replacement Project (Streambed Alteration Agreement No. EPIMSCCA-16599-R3)
2 Documents in Project
Summary
SCH Number
2020099004
Lead Agency
City of Hercules
Document Title
Sycamore Avenue Trunk Sewer Replacement Project (Streambed Alteration Agreement No. EPIMSCCA-16599-R3)
Document Type
NOD - Notice of Determination
Received
Posted
4/27/2023
Document Description
The project is limited to the replacement of a 5,400-linear-foot-long by 24-inch-wide asbestos municipal sewer line with a new underground 30-inch-wide HDPE/FPVC trunk sewer of equal length. The existing sewer line will be temporarily bypassed, cleaned, and partially removed where the sewer line overhangs creek areas while
abandoned in place elsewhere by being filled with concrete. Areas disturbed by the project will be remediated through the use of biodegradable erosion control techniques and revegetation.
Contact Information
Name
Andrew Chambers, Environmental Scientist
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Cities
Hercules
Counties
Contra Costa
Regions
Northern California, San Francisco Bay Area
Other Location Info
The project is located at Pinole and Refugio Creeks in the City of Hercules, California 94547; project center coordinate Latitude 38.01222, Longitude -122.29555; spanning multiple privately and publicly owned Accessor’s Parcel Numbers.
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Contra Costa
Final Environmental Document Available at
CDFW
2825 Cordelia Road, Suite 100
Fairfield, CA 94534
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.