Amendment to Reclamation Plan 96-12/Keeler- MS#300 California Department of Transportation

2 Documents in Project

Summary

SCH Number
2020099003
Lead Agency
Inyo County
Document Title
Amendment to Reclamation Plan 96-12/Keeler- MS#300 California Department of Transportation
Document Type
NOD - Notice of Determination
Received
Posted
3/17/2021
Document Description
The applicant has applied for an amendment to Reclamation Plan 96-12. The project proposes expanding mining operations at Keeler Pit MS #300 for continued maintenance of dirt shoulders in Inyo County. Approximately 300,000 cubic yards of material will be extracted from the site over a 30 to 50-year span in an 8.1 acre-expansion area. Mining will occur in 4 phases, entailing the creation of a dirt access road and a material extraction pit east and southeast of the existing pit. Four to six inches of topsoil will be relocated to soil berms on the north, south and east edges of the pit. The pit will be graded to ensure storm water containment (final slope configuration 3:1 or flatter). All equipment storage and operations will occur within the limits of the existing (lower) pit. A retention basin, to manage and contain all storm water, will be constructed in the lower pit.

Contact Information

Name
Forest Becket
Agency Name
Project Manager
Contact Types
Project Applicant

Name
Ryan Standridge
Agency Name
SMARA Coordinator
Contact Types
Lead/Public Agency

Location

Cities
Keeler
Counties
Inyo
Regions
Countywide
Parcel #
031-010-19
State Highways
Hwy 136
Railways
none
Airports
none
Schools
none
Township
17
Range
38E
Section
15

Notice of Determination

Approving Agency
Inyo County
Approving Agency Role
Lead Agency
Approved On
County Clerk
Inyo
Final Environmental Document Available at
Inyo County Planning Department

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print