Conveyance of up to 1,959 acre-feet of 2020 Central Valley Project Cross Valley Water to Kern County Water Agency (SWPAO #20027-A)

Summary

SCH Number
2020090543
Public Agency
California Department of Water Resources (DWR)
Document Title
Conveyance of up to 1,959 acre-feet of 2020 Central Valley Project Cross Valley Water to Kern County Water Agency (SWPAO #20027-A)
Document Type
NOE - Notice of Exemption
Received
Posted
9/29/2020
Document Description
SWPAO #20027-A amends the Letter Agreement between KCWA and the Department of Water Resources of the State of California (DWR) executed on September 3, 2020 (SWPAO #20027). SWPAO #20027 sets forth the terms and conditions for the conveyance of up to 1,959 acre-feet of 2020 Central Valley Project (CVP) Cross Valley water (Non-Project Water) to KCWA, on behalf of its member unit, Wheeler Ridge-Maricopa Water Storage District (WRMWSD). This Non-Project Water was acquired from the following CVP contractors: Hills Valley Irrigation District, Tri-Valley Water District, and the County of Tulare. The United States Bureau of Reclamation (Reclamation) would make the Non-Project Water available at O’Neill Forebay for subsequent delivery by DWR to KCWA’s service area for use within WRMWSD’s CVP place of use by February 28, 2021. SWPAO #20027-A amends SWPAO #20027 by adding Banks Pumping Plant as a point where the Non-Project Water will be made available to DWR by Reclamation, in addition to O’Neill Forebay, for subsequent delivery to KCWA’s turnout(s).

Contact Information

Name
James Edwards
Agency Name
Department of Water Resources
Contact Types
Lead/Public Agency

Location

Counties
Kern
Other Location Info
From O’Neill Forebay and/or Banks Pumping Plant to Kern County Water Agency’s (KCWA) turnout(s) located within Reaches 9A through 16A of the California Aqueduct

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 1; CEQA Guidelines Section 15301, existing facility
Reasons for Exemption
a. State Water Project long-term water supply contract includes provisions for conveyance of non-project water to SWP contractors. b. No construction is required to implement the proposed delivery. c. The facilities are existing facilities that have not been expanded or modified to implement the proposed change in points of delivery. d. There will be no change in land use.

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print