Lake Fordyce Dam Seepage Mitigation (Lake or Streambed Alteration Agreement No. 1600-2020- 0147-R2)

6 Documents in Project

Summary

SCH Number
2020090506
Lead Agency
State Water Resources Control Board
Document Title
Lake Fordyce Dam Seepage Mitigation (Lake or Streambed Alteration Agreement No. 1600-2020- 0147-R2)
Document Type
NOD - Notice of Determination
Received
Posted
12/28/2020
Document Description
Three culvert extensions will occur at three separate intermittent drainage crossings. The existing culverts will be modified by adding extensions as a part of improving existing turn radii. Pipe couplings will be used to attach the culvert extensions to the existing culverts, the extensions will have the same capacity and diameter as the existing culverts. Culvert extensions 1 and 2 will be located at the outfalls and culvert extension 3 will be installed on the inlet. Rock dissipaters used for slope protection will be installed a maximum of 20 feet from the existing road prism at culvert extension 1 and 30 feet from the existing road prism at culvert extension 2. Once the extensions are installed, earth and gravel will be installed on the road surface to match the existing grade.

Contact Information

Name
Caitlyn Oswalt
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
Matt Walker, PG &E
Contact Types
Project Applicant

Location

Counties
Nevada
Regions
Northern California
Waterways
Rattlesnake Creek
Other Location Info
Along Fordyce Lake Road which lies between Hampshire Rocks Road at Cisco Grove exit from I-80 and Fordyce Lake.

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.