Palo Alto Flood Basin Tide Gate Structure Replacement Project
2 Documents in Project
Summary
SCH Number
2020090237
Lead Agency
Santa Clara Valley Water District
Document Title
Palo Alto Flood Basin Tide Gate Structure Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
4/29/2021
Document Description
Santa Clara Valley Water District (Valley Water) is proposing to replace the existing Palo Alto Flood Basin tide gate structure in order to maintain flood protection in the communities surrounding the flood basin and along the U.S. Highway 101 corridor. The Project would involve construction of a new 132-foot-wide tide gate structure slightly inboard (upstream) and southeast of the existing 113-foot-wide deteriorating tide gate structure, removal of the existing tide gate structure and levee, and construction of a new levee that ties into the new tide gate structure. Construction of the Project would occur in two phases with separate dewatering systems to allow continued operation of a tide gate throughout construction. Specific project elements include up to 2.3 miles of levee trail resurfacing (for access); installation of two sheet pile dewatering systems; construction of the new tide gate structure on a concrete foundation supported by drilled piles; demolition and removal of the existing tide gate structure and levee; and construction of a new levee connecting to the new tide gate structure. Construction would span up to 5 years but would be limited to September 1 through January 31 annually to avoid and minimize impacts on biological resources.
Contact Information
Name
Alex Hunt
Agency Name
Santa Clara Valley Water District
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Palo Alto
Counties
Santa Clara
Regions
Northern California, San Francisco Bay Area
Cross Streets
n/a (Adobe Creek Loop Trail)
Zip
94303
Total Acres
8.9
Parcel #
008-05-005
State Highways
None
Railways
None
Airports
Palo Alto Airport
Schools
None
Waterways
San Francisco Bay, Palo Alto Flood Basin
Township
6S
Range
2W
Section
9
Base
Mt.Diabo
Notice of Determination
Approving Agency
Santa Clara Valley Water District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
https://www.valleywater.org/project-updates/creek-river-projects/palo-alto-flood-basin-tide-gate-structure-replacement-project
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.