Sewer Collection System and Wastewater Treatment Plant Improvements

3 Documents in Project

Summary

SCH Number
2020089014
Lead Agency
City of Colfax
Document Title
Sewer Collection System and Wastewater Treatment Plant Improvements
Document Type
NOD - Notice of Determination
Received
Posted
11/29/2021
Document Description
The Project includes three components: (1) a 750-kW solar array to offset operational costs at the City's wastewater treatment plant; (2) an algae control system to improve treatment efficiency; and (3) rehabilitation (replacement) of up to five miles of the sewer pipelines, manholes and services to reduce stormwater and groundwater inflow and infiltration.

Contact Information

Name
Cedric Irving
Agency Name
State Water Resources Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Colfax
Counties
Placer
Township
14 N
Range
9 E
Section
11
Base
MD
Other Information
The Project is located in the City of Colfax (City), in Placer County, California. The sewer lines subject to replacement are located in disturbed areas near Interstate 80 and State Route 174, and improvements at the wastewater treatment plant are approximately located on 62.5 acres southeast of the City at Section 11, Township 14 North, Range 9 East, Mount Diablo Meridian, California.

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Placer
Final Environmental Document Available at
1001 I Street, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print