Cottage Creek Dam Modification Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2020080441
- Lead Agency
- Yuba County Water Agency
- Document Title
- Cottage Creek Dam Modification Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 10/15/2020
- Project Applicant
- Yuba Water Agency
- Document Description
- The Project consists of removing the existing metal pipe spillway and downstream culvert, excavating a portion of Cottage Creek dam to a lower elevation, and installing a large concrete box culvert sized to pass all Cottage Creek flows downstream past the dam and into New Bullards Bar Reservoir. This would result in drainage of the Cottage Creek Reservoir. Cottage Creek Reservoir would no longer capture water, but water would continue to move through the area and the area would function as a wetland.
- Contact Information
-
Tim Truong
Yuba Water Agency
1220 F Street
Marysville, CA 95901
Phone : (530) 740-7081
TTruong@yubawater.org
Location
- Coordinates
- 39°23'38"N 121°8'54"W
- Cities
- Dobbins (nearest City) Marysville
- Counties
- Yuba
- Cross Streets
- Access from Emerald Cove Marina (Marysville Road)
- Zip
- 95931
- Total Acres
- 0.35
- Parcel #
- 064260010000 & 064260013000
- State Highways
- N/A
- Railways
- N/A
- Airports
- N/A
- Township
- 18 Nor
- Range
- 7 E
- Section
- 25/26
Notice of Determination
- Approving Agency
- Yuba Water Agency Board of Directors
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Yuba Water Agency's office located at 1220 F Street Marysville, CA 95901
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- Notice_of_Determination_Yuba_County_(10-09-2020) PDF 1308 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.