Addendum to Innovative Barracuda Chassis Depot Final IS/ND
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2020080336
- Lead Agency
- Port of Los Angeles
- Document Title
- Addendum to Innovative Barracuda Chassis Depot Final IS/ND
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 3/15/2021
- Document Description
- The proposed Project would entitle property currently operated as a chassis depot to include the new use of cargo handling support, which adds the storage and handling of shipping containers for the entire premises. The new activities would operate in conjunction with the chassis depot operations evaluated in the Final IS/ND. Additionally, an approximately 2.65 acre expansion would be added for existing truck trip queuing and as-needed storage on Barracuda and Bass Streets, which are currently closed off from thoroughfare, expanding the entitled area to approximately 16.40 acres. These street entitlements would be terminated when street access needs to be restored. Also, a minor construction component would be added, which is grading and laying of crushed aggregate base or gravel for the duration of a short-term entitlement. This entitlement would not exceed 12 months and includes incorporation of Best Management Practices. The facility is part of Port property located on the western portion of Terminal Island. The proposed modifications would create no potential adverse impacts or substantial changes to impact areas previously analyzed in the Final IS/ND.
- Contact Information
-
Leah Kohler
City of Los Angeles- Port of Los Angeles (Harbor Department)
Lead/Public Agency
425 S. Palos Verdes St.
San Pedro, CA 90731
Phone : (310) 732-7673
lkohler@portla.org
Location
- Cities
- San Pedro
- Counties
- Los Angeles
- Regions
- Citywide
- Other Information
- 915 Earle Street, San Pedro, CA 90731
Notice of Determination
- Approving Agency
- City of Los Angeles- Port of Los Angeles (Harbor Department)
- Approving Agency Role
- Lead Agency
- Approved On
- County Clerk
- Los Angeles
- Final Environmental Document Available at
- https://www.portoflosangeles.org/environment/environmental-documents
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- No
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Attachments
- Notice of Determination
- Innovative_Barracuda_Addendum_NOD_3-12-21 PDF 646 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.