2020 Pipeline Replacement Program

4 Documents in Project

Summary

SCH Number
2020079025
Lead Agency
Valley Center Municipal Water District
Document Title
2020 Pipeline Replacement Program
Document Type
NOD - Notice of Determination
Received
Posted
10/20/2020
Document Description
On October 19, 2020, Valley Center Municipal Water District (District) adopted the Final Initial Study Mitigated Negative Declaration (MND) (State Clearinghouse No. 2020079025) and Mitigation Monitoring and Reporting Program, and approved the Pipeline Replacement Program (Program). The Program would address infrastructure deficiencies that have contributed to an increase in the number of pipe breaks and joint failures in recent years. To address these and other deficiencies, the Program would systematically replace or upgrade the infrastructure, identifying and prioritizing the following projects that are to be completed within the next five years: • WSo15b - Old Castle Road Pipeline • MW015a - Oat Hill Discharge Pipeline North • SG022 - Lilac Pala Pump Station Discharge Pipeline • CV011 - Cole Grade Road Pipeline • CV018a - Alps Way Culvert Crossing Pipe Replacement • CV017a-Rock Hill Ranch Road Intertie • CV012a- Fruitvale Road Valves • PD0 16 - Hell Hole Creek Joint Repair • DW001 - Gordon Hill Road • CV0S0 - Lilac Road Pipeline Upsize All construction would occur within or adjacent to existing road corridors or within disturbed alignment. The disturbance areas would be limited to the construction phase and all disturbed areas would be restored to preconstruction conditions. Typical excavation depth would range from 3-5 feet below existing grade. All materials and equipment would be staged within the active construction area, within disturbed areas located adjacent to the corridor or at existing District properties located in proximity to the construction area.

Contact Information

Name
Wally Grabbe
Agency Name
Valley Center Municipal Water District
Contact Types
Lead/Public Agency

Name
Agency Name
Valley Center Municipal Water District
Contact Types
Project Applicant

Location

Counties
San Diego
Other Location Info
The 2020 Pipeline Replacement Program is comprised of 10 individual projects located throughout the Valley Center Municipal Water District service area. See Attachment 1.

Notice of Determination

Approving Agency
Valley Center Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.