2020079020 - NOD Pillar Point West Trail Living Shoreline Project

2 Documents in Project

Summary

SCH Number
2020079020
Lead Agency
San Mateo County Harbor District
Document Title
2020079020 - NOD Pillar Point West Trail Living Shoreline Project
Document Type
NOD - Notice of Determination
Received
Posted
2/24/2021
Document Description
This is a Notice of Determination associated with the Initial Study/Mitigated Negative Declaration for the Pillar Point West Trail Living Shoreline Project (Project). The San Mateo County Harbor District has determined that the Project will not have a significant effect on the environment. The proposed Project includes the stabilization of the West Trail and stormwater system improvements. To protect and stabilize the trail, the proposed project would include the construction of a nourished beach with an elevated dune adjacent to, and east of, 300 feet of the trail. Buried beneath the surface of the shoreline and dune would be a cobble berm (otherwise known as a dynamic revetment) and two rock fingers extending perpendicular from the trail. The stormwater improvements would address the aesthetics, function, and maintenance needs of the existing storm drain system as well as provide water quality improvements to the harbor.

Contact Information

Name
John Moren
Agency Name
Director of Operations, San Mateo County Harbor District
Contact Types
Lead/Public Agency

Location

Counties
San Mateo
Regions
Countywide
Other Location Info
West Trail, Pillar Point Harbor

Notice of Determination

Approving Agency
San Mateo County Harbor District
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Mateo
Final Environmental Document Available at
Pillar Point Harbor, Harbormasters Office, One Johnson Pier, Half Moon Bay, CA

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Initial Study)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print