2020079020 - NOD Pillar Point West Trail Living Shoreline Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2020079020
- Lead Agency
- San Mateo County Harbor District
- Document Title
- 2020079020 - NOD Pillar Point West Trail Living Shoreline Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/24/2021
- Document Description
- This is a Notice of Determination associated with the Initial Study/Mitigated Negative Declaration for the Pillar Point West Trail Living Shoreline Project (Project). The San Mateo County Harbor District has determined that the Project will not have a significant effect on the environment. The proposed Project includes the stabilization of the West Trail and stormwater system improvements. To protect and stabilize the trail, the proposed project would include the construction of a nourished beach with an elevated dune adjacent to, and east of, 300 feet of the trail. Buried beneath the surface of the shoreline and dune would be a cobble berm (otherwise known as a dynamic revetment) and two rock fingers extending perpendicular from the trail. The stormwater improvements would address the aesthetics, function, and maintenance needs of the existing storm drain system as well as provide water quality improvements to the harbor.
- Contact Information
-
John Moren
Director of Operations, San Mateo County Harbor District
Lead/Public Agency
PO BOX 1449
EL GRANADA, CA 94019
Phone : (650) 741-9163
jmoren@smharbor.com
Location
- Counties
- San Mateo
- Regions
- Countywide
- Other Location Info
- West Trail, Pillar Point Harbor
Notice of Determination
- Approving Agency
- San Mateo County Harbor District
- Approving Agency Role
- Lead Agency
- Approved On
- County Clerk
- San Mateo
- Final Environmental Document Available at
- Pillar Point Harbor, Harbormasters Office, One Johnson Pier, Half Moon Bay, CA
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- Yes (Initial Study)
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- 2021_02_12_Appendix_D_NOD PDF 84 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.