Hardin Road Stream Crossing Installation Project (Lake or Streambed Alteration Agreement, EPIMSSHA-21292-R1I)

2 Documents in Project

Summary

SCH Number
2020079013
Lead Agency
Shasta County
Document Title
Hardin Road Stream Crossing Installation Project (Lake or Streambed Alteration Agreement, EPIMSSHA-21292-R1I)
Document Type
NOD - Notice of Determination
Received
Posted
9/29/2021
Document Description
The project is limited to the installation of a 48-inch corrugated metal pipe (CMP) culvert within the channel of an ephemeral tributary to Dunn Creek and the construction of a new roadway across the stream. Approximately 112 cubic yards of native soils, 20.4 cubic yards of class II aggregate road base rock, and 4.9 cubic yards of asphalt concrete (AC) pavement, as well as gravel shoulders will be installed over the CMP to provide a permanent stream crossing. The project will result in 1,100 linear feet of new roadway, which is part of a larger project that is reconstructing and paving an additional 2,750 linear feet of existing tribal road. The CMP will have flared ends and a 12-foot energy dissipator at the outlet. Approximately .05 acres of channel will be directly impacted and approximately 100 square feet of brush will be removed because of project activities. A Stormwater Pollution Prevention Plan is in place and will be followed to avoid indirect impacts resulting from sedimentation from project activities.

Contact Information

Name
Helen Bowman
Agency Name
California Department of Fish and Wildlife
Contact Types
Responsible Agency

Location

Counties
Shasta
Regions
Northern California
Zip
96065
Parcel #
029-520-004-000
Waterways
Unnamed Tributary to Dunn Creek

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Shasta
Final Environmental Document Available at
Shasta County Department of Resource Management

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (NOD)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print