Carmel Valley Manor Sewer Main Extension Project
3 Documents in Project
Summary
SCH Number
2020070582
Lead Agency
Carmel Area Wastewater District
(CAWD)
Document Title
Carmel Valley Manor Sewer Main Extension Project
Document Type
NOD - Notice of Determination
Received
Posted
9/24/2020
Present Land Use
Pipeline: n/a. within public ROW; Pump Station Site: Low Density Residential zoning; Residential Low Density land use
Document Description
The project would extend sewer service to the existing Carmel Valley Manor senior living facility. The project includes the installation and operation of approximately 9,900 linear feet (LF) of 8-inch diameter polyvinyl chloride (PVC) gravity sewer main, approximately 900 LF of 6-inch diameter force main, concrete manholes, and a 250 gallon per minute wastewater pump station. From the proposed gravity-fed sewer, wastewater would be pumped by the proposed pump station into the proposed force main, discharging to the existing collection system at the west abutment of the County Bridge 500 crossing over the Carmel River on Valley Greens Drive. Wastewater would be conveyed through the existing collection system to the CAWD Water Pollution Control Plant. The wastewater pump station would be a small (approximately 1,600 square feet) fully developed municipal site, equipped with a back-up generator; new electrical service; wet well with submersible wastewater pumps; pipes, valves, etc.; electrical and communications facilities; pumps control unit; and surface improvements. These pumps would be placed underground, submerged in a wet well. A10-foot access driveway to the pump station would be located between two existing trees.
Contact Information
Name
Rachel Lather
Agency Name
Carmel Area Wastewater District
Contact Types
Lead/Public Agency
Address
Phone
Email
Name
Agency Name
Rachel Lather, Principal Engineer
Contact Types
Project Applicant
Location
Cities
Carmel-by-the-Sea
Counties
Monterey
Regions
Northern California, Unincorporated
Cross Streets
Carmel Valley Road and Valley Greens Drive
Zip
93923
Parcel #
157-031-015-000 (pump station site)
State Highways
n/a
Railways
n/a
Airports
n/a
Schools
Various
Waterways
Carmel River
Notice of Determination
Approving Agency
Carmel Area Wastewater District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.