South Kaweah Mutual Water Company Three Rivers Tanks Project
2 Documents in Project
Summary
SCH Number
2020070416
Lead Agency
State Water Resources Control Board
Document Title
South Kaweah Mutual Water Company Three Rivers Tanks Project
Document Type
NOD - Notice of Determination
Received
Posted
12/22/2020
Document Description
South Kaweah Mutual Water Company proposes to remove an existing 24-foot high, 32-foot diameter, 150,000-gallon bolted steel water storage tank that is deteriorating and replace it with two new 24-foot high, 28-foot diameter 100,000-gallon storage tanks. Asphalt will be added to an approximately 0.2-mile unnamed roadway from Terminus Court to the Tank site. The roadway, at a hairpin turn, will be widened by 10 feet (five feet on either side of road, but within the existing road right of way), for approximately 52 linear feet, 260 feet south of the tank site. Five oak trees will be removed at the tank site to allow for excavation. Two hundred feet of additional 6-foot tall chain link fence will be installed for security. Approximately 80 feet of swales will also be also installed.
Contact Information
Name
Wendy Pierce
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
South Kaweah Mutual Water Company
Contact Types
Project Applicant
Location
Counties
Tulare
Regions
Countywide
Cross Streets
near 40707 Terminus Court in Three Rivers, CA
Zip
93271
Notice of Determination
Approving Agency
State Water Resources Control Board
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.