Lake or Streambed Alteration Agreement No. 1600-2020-0264-R1, “Jackrabbit” Timber Harvesting Plan (THP) 2-20-00052-SHA

Summary

SCH Number
2020070373
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Lake or Streambed Alteration Agreement No. 1600-2020-0264-R1, “Jackrabbit” Timber Harvesting Plan (THP) 2-20-00052-SHA
Document Type
NOD - Notice of Determination
Received
Posted
7/17/2020
Document Description
The project is limited to four (4) encroachments. Each of the encroachments will include minor vegetation removal. One (1) of the temporary crossings will be conducted in accordance with an existing Agreement. The other encroachments include stream substrate removal and temporary installation of corrugated metal pipe (CMP) culvert(s) with rock/log fill and rocked running surface at one (1) existing rocked ford crossing and stream substrate removal and skidding operations at two (2) existing ford crossings.

Contact Information

Name
Harvest Vieira
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
California Forestry and Fire Protection
Contact Types
Project Applicant

Location

Counties
Shasta
Other Location Info
The project is located at Unnamed tributaries to Burney Creek in the Jackrabbit Flat and Terry Lake planning watersheds (CalWater IDs 5526.330202 and 5526.330201); in the County of Shasta, State of California; Township 35N Range 02E Sections 22, 23, 25; Mt. Diablo baseline and meridian, U.S. Geological Survey maps, Burney Mt. West, CA (1990) and Burney, CA (1990).

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print