GEO CalEnergy 0402591583
3 Documents in Project
Summary
SCH Number
2020070286
Lead Agency
Imperial County
Document Title
GEO CalEnergy 0402591583
Document Type
NOD - Notice of Determination
Received
Posted
11/13/2024
Document Description
The originally approved project consists of:
The expansion to 111,444 acres and development of the geothermal overlay zone, which includes onshore and offshore lands at the Salton Sea Anomaly, located along the southeast shore of the Salton Sea in Imperial County. Development includes construction, operation, and maintenance of geothermal power plants, geothermal wells, pipelines, and other associated facilities and infrastructure. Imperial County, as Lead Agency, prepared and approved an Environmental Impact report (EIR) in May 1982. The California Geologic Energy Management Division (CalGEM) considered the EIR prepared by the Lead Agency and issued a Permit to Conduct Well Operations for one well.
CalGEM has approved permits for CalEnergy Operating Corporation to install the geothermal well listed below, in the Salton Sea geothermal field.
API# Well Name
02591583 Elmore IW 7
Contact Information
Name
John Huff
Agency Name
California Geologic Energy Management Division
Job Title
Associate Oil and Gas Engineer
Contact Types
Responsible Agency
Phone
Location
Coordinates
Counties
Imperial
Regions
Southern California
Cross Streets
Garst Road and West Sinclair Road
Township
11S
Range
13E
Section
34
Base
SB
Other Location Info
Salton Sea geothermal field
Notice of Determination
Approving Agency
California Geologic Energy Management Division
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Imperial
Final Environmental Document Available at
Imperial County Planning and Development Services, 801 Main St., El Centro, CA 92243
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.