American River Watershed Common Features 2016 Project, Sacramento River Erosion Contract 1: River Mile 55.2 Left Bank Protection
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2020070269
- Lead Agency
- Central Valley Flood Protection Board
- Document Title
- American River Watershed Common Features 2016 Project, Sacramento River Erosion Contract 1: River Mile 55.2 Left Bank Protection
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/21/2020
- Document Description
- The Project includes the installation of approximately 1,150 feet of erosion protection along the Sacramento River’s left bank and east levee in Sacramento, California. The purpose of the Project is to reduce the risk of flooding to the City of Sacramento by constructing levee improvements that reduce the risk of levee failure due to levee erosion during high water events. The Project also includes the installation of a riparian planting bench and instream woody material to provide on-site habitat to fish and wildlife species.
- Contact Information
-
Miles Claret
Central Valley Flood Protection Board
Lead/Public Agency
3310 El Camino Avenue, Suite 170
Sacramento, CA 95821
Phone : (916) 574-0251
Miles.Claret@water.ca.gov
Location
- Cities
- Sacramento
- Counties
- Sacramento
- Other Location Info
- The Project is located long left bank (when facing downstream) of the Sacramento River near the Little Pocket area in the City and County of Sacramento.
Notice of Determination
- Approving Agency
- Central Valley Flood Protection Board
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- This is to certify that the final EIR with comments and responses and record of project approval is available to the General Public at the Board’s office located at 3310 El Camino Avenue, Suite 170, Sacramento, CA 95821. Please note, the NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board Staff at: questions@cvflood.ca.gov
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- 2020070269_CDFW Filing Receipt PDF 348 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.