Avalon K-12 HVAC, ADA, Contaminated Soil Removal and New Synthetic Turf Field Project
2 Documents in Project
Download CSV
Download All Attachments
New Search
Print
Summary
- SCH Number
- 2020070229
- Lead Agency
- Long Beach Unified School District
- Document Title
- Avalon K-12 HVAC, ADA, Contaminated Soil Removal and New Synthetic Turf Field Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 10/13/2020
- Project Applicant
- Long Beach Unified School District
- Present Land Use
- Public (K-12 school)
- Document Description
- The purpose of the Avalon K-12 School HVAC, ADA, Contaminated Soil Removal, and New Synthetic Turf Field project (“Proposed Project”) is to provide: HVAC to permanent buildings, interior improvements to buildings on the campus, and ADA improvements. Additionally, the Proposed Project will replace the existing natural turf athletic field with a new synthetic turf field; the Proposed Project will also remove delineated contaminated soil and any additional contaminated soil encountered that is located on the campus.
- Contact Information
-
Elston Soares
Long Beach Unified School District
2425 Webster Avenue
Long Beach, CA 90810
Phone : (562) 997-7550
CEQA@lbschools.net
Location
- Cities
- Avalon
- Counties
- Los Angeles
- Cross Streets
- 200 Falls Canyon Road
- Zip
- 90704
- Total Acres
- 11.5
- Parcel #
- 7480-002-907
- Schools
- Avalon K-12
- Waterways
- Avalon Bay
Notice of Determination
- Approving Agency
- Long Beach Unified School District Board of Education
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- http://lbschoolbonds.net/avalon-k12.cfm
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Environmental Document
- LBUSD Avalon_CDFW fee letter PDF 150 K
- Notice of Determination
- LBUSD Avalon_OPR NOD PDF 351 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.