United States Cold Storage Facility Solar Project

2 Documents in Project

Summary

SCH Number
2020070032
Lead Agency
Tulare, City of (City of Tulare)
Document Title
United States Cold Storage Facility Solar Project
Document Type
NOD - Notice of Determination
Received
Posted
8/17/2020
Project Applicant
Entersolar, 805 Third Ave. 20th Floor, New York, NY 10022 (888) 225-0870
Present Land Use
Vacant land

Document Description
Installation of an 810-kw direct current photovoltaic 15 panel array. The array will be located on an approximately 2.2-acre portion of a 30.6-acre parcel to offset energy use of an on-site industrial cold storage facility, United States Cold Storage, by 25%. The arrays will consist of solar panels installed on pile-driven steel structures, various pad top electrical equipment such as switchgear, transformers, and inverters, and overhead or underground electrical circuits.

Contact Information
Steven Sopp
City of Tulare
411 E. Kern Avenue
Tulare, CA 93274

Phone : (559) 684-4216
Fax : (559) 685-2398
ssopp@tulare.ca.gov

Location

Cities
Tulare
Counties
Tulare
Regions
Southern California
Cross Streets
North side of Levin Avenue, east of south 'O' Street
Zip
93274
Total Acres
2.2
Parcel #
181-080-007
State Highways
SR-99, SR-63, SR-137
Railways
Union Pacific
Airports
Medford Field
Schools
Cypress School, Tulare Union High School, Frank Kohn Elementary
Waterways
Tulare Canal
Township
20S
Range
24E
Section
14
Base
MDB&M

Notice of Determination

Approving Agency
City of Tulare
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
City of Tulare, 411 E. Kern Avenue, Tulare , CA 93274

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s)
FINAL IS-MND USCS Facility   PDF 10975 K Summary_Form_for_Document_Submittal   PDF 578 K
Notice of Determination
NOD-ocr   PDF 138 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print