Rector Reservoir Bypass Valve Project

3 Documents in Project

Summary

SCH Number
2020070017
Lead Agency
Department of Veterans Affairs
Document Title
Rector Reservoir Bypass Valve Project
Document Type
NOD - Notice of Determination
Received
Posted
11/18/2021
Document Description
CalVet would implement an interim schedule for minimum environmental release of water to Rector Creek below Rector Dam located in Napa County, California, approximately 2.5 miles northeast of the town of Yountville. The releases are needed to meet California Fish and Game Code 5937 requirements. To facilitate these releases, CalVet proposes to construct new facilities below Rector Dam to convey monitor and release stored water from the reservoir to Rector Creek. These facilities include a bypass valve at the base of Rector Dam and a raw water pipeline connecting the valve to a proposed outfall structure on Rector Creek downstream of the dam.

Contact Information

Name
David Gerard
Agency Name
CA Department of Veterans Affairs
Contact Types
Lead/Public Agency

Name
Terry Ash
Agency Name
Department of General Services, Senior Environmental Planner
Contact Types
Lead/Public Agency

Location

Cities
Yountville
Counties
Napa
Regions
Countywide
Cross Streets
Silverado Trail
Zip
94558
Waterways
Rector Reservoir, Rector Creek, LeRette Creek, Napa River

Notice of Determination

Approving Agency
Department of Veterans Affairs
Approving Agency Role
Lead Agency
Approved On
County Clerk
Napa
Final Environmental Document Available at
http://yvhsnfproject.com/documents, the Yountville Veterans Home Library, and upon request to the Lead Agency.

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print