9th Avenue Sewer Trunk Main Project

Summary

SCH Number
2020060654
Lead Agency
City of Hanford
Document Title
9th Avenue Sewer Trunk Main Project
Document Type
NOD - Notice of Determination
Received
Posted
6/29/2020
Document Description
The construction of a sewer trunk main from the City's Wastewater Treatment Facility on Houston Avenue near 11th Avenue, east along Houston Avenue to 9th Avenue and then north to an existing sewer main in Lacey Boulevard. The sewer trunk line is intended to be a 30-inch diameter pipe from the Wastewater Treatment Facility to the intersection of 9th Avenue and Hanford-Armona Road. The sewer trunk line is intended to be a 24-inch diameter in 9th Avenue from Hanford-Armona Road north to Lacey Boulevard. The sewer trunk main would be constructing within existing rights of way of Houston Avenue and 9th Avenue. The total length of sewer main is proposed to be approximately 3.8 miles and will include four jack and bore installations. Construction will entail trenching a 4-foot wide by 16 to 18 foot deep trench and installing the sewer pipeline. Total land disturbance will be approximately 7 acres.

Contact Information

Name
Darlene R. Mata
Agency Name
City of Hanford
Contact Types
Lead/Public Agency

Name
Agency Name
City of Hanford
Contact Types
Project Applicant

Location

Cities
Hanford
Counties
Kings
Other Location Info
The project will be located within or adjacent to Township 19 N, Range 21 E, Sections 1 and 12, Township 19 N, Range 22 E, Section 5, 6, 7, and 8 and Township 18 N, Range 22 E, Sections 29, 30, 31, and 32

Notice of Determination

Approving Agency
City of Hanford
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print