Upper Drainages Erosion Control Improvements
3 Documents in Project
Download CSV
Download All Attachments
New Search
Print
Summary
- SCH Number
- 2020060620
- Lead Agency
- California Department of Transportation, District 5 (DOT)
- Document Title
- Upper Drainages Erosion Control Improvements
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/16/2020
- Present Land Use
- state highway
- Document Description
- The project would replace or modify drainage systems that are deteriorated and/or undersized and that are plugging, overtopping, or flooding and thereby causing erosion. The project would plug and fill the old pipe culverts; install new, larger pipe culverts; place rock slope protection at outlets where needed; replace substandard inlets; and add minor paving where open ground is causing excessive sediment in the drainage system. An existing retaining wall would be rebuilt and lengthened. The Skyline-to-the-Sea Trail would be repaired where erosion has created a slipout. Guardrail would be repaired where necessary.
- Contact Information
-
Paula Huddleston
California Department of Transportation
Lead/Public Agency
50 Higuera Street
San Luis Obispo, CA 93401
Phone : (805) 549-3063
paula.huddleston@dot.ca.gov
Location
- Counties
- San Mateo Santa Cruz
- Regions
- Countywide Northern California Unincorporated
- Cross Streets
- multiple
- State Highways
- Route 9
- Railways
- none
- Airports
- none
- Schools
- none
- Waterways
- San Lorenzo River and tributaries
- Other Location Info
- Near Ben Lomond and Boulder Creek
- Other Information
- Along Highway 9 in Santa Cruz and San Mateo Counties from Scenic Way in Ben Lomond to 0.25 mile north of the Summit Meadows trailhead parking lot.
Notice of Determination
- Approving Agency
- California Dept of Transporation
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- https://dot.ca.gov/caltrans-near-me/district-5/district-5-current-projects/upper-drainage-erosion-control-improvements
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Attachments
- Final Document(s)
- FED- SCR-9 05-1G950, signed PDF 1472 K
- Notice of Determination
- CEQA CDFW Fee PDF 345 K NOD, signed PDF 150 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.