COUNTY OF SAN DIEGO SANITATION DISTRICT: LOS COCHES SANITARY SEWER IMPROVEMENTS FROM MAINTENANCE HOLE LSMH0555 TO LSMH0599 PROJECT (DISTRICT: 2)

3 Documents in Project

Summary

SCH Number
2020060316
Lead Agency
San Diego County
Document Title
COUNTY OF SAN DIEGO SANITATION DISTRICT: LOS COCHES SANITARY SEWER IMPROVEMENTS FROM MAINTENANCE HOLE LSMH0555 TO LSMH0599 PROJECT (DISTRICT: 2)
Document Type
NOD - Notice of Determination
Received
Posted
9/4/2020
Document Description
Based on an evaluation of pipeline surveying data, the proposed work includes two main elements: installation of a composite lining within the existing pipe using the Cured-in-Place Pipe method, and in three minor sections of the subject reach, the pipeline requires reinforcement and protection within the streambed.

Contact Information

Name
Cynthia Curtis
Agency Name
County of San Diego Department of Public Works
Contact Types
Lead/Public Agency

Name
Agency Name
County of San Diego Sanitation District
Contact Types
Project Applicant

Location

Counties
San Diego
Other Information
The existing sanitary sewer collection pipeline is located along Los Caches Creek south of Old Highway 80, between its intersections with Gaucho Lane to the west and Flinn Crest Street to the east. The subject reach is an approximately 7,500 foot segment of existing pipeline between County Sanitation District's maintenance holes LSMH0555 to LSMH0599 in the unincorporated San Diego County community of Lakeside.

Notice of Determination

Approving Agency
County of San Diego Sanitation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print