Carbon Canyon Channel Flood Control Improvement Project (Lake or Streambed Alteration Agreement No. EPIMS-SBR-30356-R6)

2 Documents in Project

Summary

SCH Number
2020059039
Lead Agency
San Bernardino Flood Control District
Document Title
Carbon Canyon Channel Flood Control Improvement Project (Lake or Streambed Alteration Agreement No. EPIMS-SBR-30356-R6)
Document Type
NOD - Notice of Determination
Received
Posted
5/22/2023
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-SBR-30356-R6), pursuant to Fish and Game Code section 1602, the project Applicant, the San Bernardino County Flood Control District (Permittee) as represented by Anthony Pham. The Project is limited to the construction of an approximately 4,800-linear foot-long flood control channel, including a 4,200-foot-long trapezoidal channel with concrete side slope and articulating block invert, a 50-foot-long double concrete box, and a 560-foot long rectangular concrete channel. The concrete-lined channel will replace an undersized earthen channel.

Contact Information

Name
Marina Barton
Agency Name
Fish and Wildlife, Region 6
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
San Bernardino
Regions
Southern California

Notice of Determination

Approving Agency
Fish and Wildlife, Region 6
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
San Bernardino County Flood Control District 825 E. Third Street Highland, CA 92415

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print