Master Joint Revocable Permit - Air Products and Chemicals, Inc.

8 Documents in Project

Summary

SCH Number
2020059038
Lead Agency
Port of Long Beach
Document Title
Master Joint Revocable Permit - Air Products and Chemicals, Inc.
Document Type
NOD - Notice of Determination
Received
Posted
2/24/2021
Document Description
Air Products and Chemicals, Inc. (Air Products) submitted an application to each the Port of Long Beach (Port) and the Port of Los Angeles (collectively referred to as the “Joint Ports”) for the issuance of a Master Joint Revocable Permit, seeking in part, permission and entitlement for a change-in-use from petroleum to hydrogen gas for an existing subsurface pipeline owned by Paramount Pipeline, LLC and operated by Air Products—“Line 4”. The potential environmental effects associated with the transport of hydrogen gas through the pipeline “Line 4” was assessed in the Air Products Hydrogen Pipeline Project Final Environmental Impact Report (EIR) certified under the California Environmental Quality Act (CEQA) by the Lead Agency, the City of Carson, on November 10, 2020 (State Clearinghouse No. 2020059038).

Contact Information

Name
Allyson Teramoto
Agency Name
Port of Long Beach
Contact Types
Responsible Agency

Location

Cities
Long Beach
Counties
Los Angeles
Regions
Southern California
Cross Streets
825 feet north of Market Street
Other Location Info
Port of Long Beach and Port of Los Angeles jointly-owned property on the former Union Pacific Railroad San Pedro Branch railroad right of way

Notice of Determination

Approving Agency
Port of Long Beach
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
City of Carson’s website at: https://ci.carson.ca.us/communitydevelopment/HydrogenGas.aspx

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print