St. Anthony On-site Sewer and Water Distribution System

2 Documents in Project

Summary

SCH Number
2020059023
Lead Agency
State Water Resources Control Board, Divison of Financial Assistance
Document Title
St. Anthony On-site Sewer and Water Distribution System
Document Type
NOD - Notice of Determination
Received
Posted
2/15/2023
Document Description
The Project includes the construction of an on-site sewage collection system, on-site water distribution system, and two detention basins to capture stormwater. The proposed on-site sewage collection system and laterals will convey sewage from each mobile home to the existing Coachella Valley Water District (CVWD) lift station located at Lincoln Street and Avenue 68. The on-site sewer system will consist of approximately 32 manholes, approximately 2,200 linear feet of laterals, and approximately 7,250 linear feet of sewer main pipe. The proposed on-site water distribution system will consist of approximately 8,350 linear feet of water main interconnecting the mobile homes to the CVWD’s future off-site water main located under Lincoln Street. In addition, a 20,000-gallon hydropneumatics water storage tank will be located on the northeast corner of the Project area to serve as an emergency water supply and meet fire flow for the Mobile Home Property. The Project also includes construction of a new stormwater management infrastructure at the mobile home park to provide flood protection and to reduce pollutant load discharges to the Coachella Valley Stormwater Channel and the Salton Sea. The proposed stormwater management infrastructure will consist of the construction of a minimum of two detention basins with filtration media and a combined minimum design storage capacity of six acre-feet; 52,000 square feet of new pavement surface with a minimum of 1,400 linear feet of valley gutters to capture and convey runoff into the new detention basins; and construction of approximately 2,834 linear feet of perforated pipe to discharge treated runoff into the Coachella Valley Stormwater Channel.

Contact Information

Name
Kristen Way
Agency Name
State Water Board
Job Title
Environmental Scientist
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Regions
Southern California
Other Location Info
The Project is located immediately east of Lincoln Street and north of Avenue 68 Riverside County, California.

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Lead Agency
Approved On
County Clerk
Riverside
Final Environmental Document Available at
State Water Board, Division of Financial Assistance at 1001 I Street, 16th Floor, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print