San Joaquin Field Division Liner and Instrumentation Project

2 Documents in Project

Summary

SCH Number
2020059020
Lead Agency
California Department of Water Resources (DWR)
Document Title
San Joaquin Field Division Liner and Instrumentation Project
Document Type
NOD - Notice of Determination
Received
Posted
7/20/2020
Document Description
The California Department of Water Resources (DWR) has prepared an Initial Study/Mitigated Negative Declaration for the proposed San Joaquin Field Division Liner Raise and Instrumentation Project. The objective of the proposed project is to restore functionality and original design capacity in Pools 24 and 25 to enable DWR to increase operational flexibility, and improve safety and reliability. The proposed project would raise portions of the concrete liner on each side of Pools 24 and 25 over 1.65 miles, and involve the installation of water level monitoring instruments in Pools 22 and 25.

Contact Information

Name
Marea McCann
Agency Name
California Department of Water Resources
Contact Types
Lead/Public Agency

Name
Agency Name
California Department of Water
Contact Types
Project Applicant

Location

Counties
Kern, Kings

Notice of Determination

Approving Agency
Department of Water Resources
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print