Upper Tank Replacement Project

2 Documents in Project

Summary

SCH Number
2020050535
Lead Agency
State Water Resources Control Board
Document Title
Upper Tank Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/8/2021
Document Description
The State Water Resources Control Board (State Water Board) is the Lead Agency for the Project. The State Water Board’s Drinking Water State Revolving Fund (SRF) Program is financing the Project. The Project includes replacement of the existing 35,000-gallon redwood tank and three 10,000-gallon temporary plastic tanks with a single 122,000-gallon welded steel tank. The new storage tank would be approximately 32 feet in diameter and 26.5 feet tall and would be welded in place on a perimeter-reinforced concrete-ring foundation supported by subgrade soil. Two mature pine trees would be removed for Project construction. All construction laydown and storage would occur on the site. The new tank would be accessed by a new paved driveway, and a paved apron would surround the new tank.

Contact Information

Name
Gabriel Edwards
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Counties
Lake
Regions
Unincorporated
Cross Streets
Osceola Ave
Zip
95451
Parcel #
046-024-01
Other Location Info
North end of Osceola Avenue near Clearlake Riviera

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Lead Agency
Approved On
County Clerk
Lake
Final Environmental Document Available at
State Water Board, Division of Financial Assistance at 1001 I Street, 16th Floor, Sacramento, CA 95814.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print